Kitchen first-fix checklist: what to agree before work starts

Before kitchen first fix, agree the cabinet layout, exact appliance models, service positions, extraction route and finished floor levels. Give the kitchen designer and each trade the same dated drawings, with a named person responsible for resolving changes. This checklist helps you turn an attractive design into a coordinated brief before pipes and cables are concealed.

Pop-up socket within the Luxury of London kitchen island
Pop-up socket within the Luxury of London kitchen island. A Sheraton Interiors project.

It is especially useful when you are comparing proposals for a kitchen extension, moving an island or combining new cabinetry with building work. The decisions apply to both bespoke in-frame kitchens and German and contemporary designs.

Start with one agreed drawing revision

A room plan, kitchen elevation and builder’s drawing may show slightly different information. Before work starts, ask the team to identify the current revision and confirm which dimensions are still provisional. Mark the position of windows, doors, structural elements and any changes to wall thickness.

Separate an early design approval from the final site survey and permission to manufacture. Ask when dimensions will be checked, who records them and what happens if the finished room differs from the initial plan. A room can look ready while plaster, flooring or service routes remain unresolved.

The first-fix decisions to put in writing

Decision What the team needs
Cabinetry and island Approved layout, cabinet dimensions, appliance housings and clearances for opening doors and drawers.
Appliances Exact model references and current installation instructions, including access and ventilation requirements.
Water and waste Agreed sink, dishwasher and water-fed appliance positions; responsibility for confirming routes.
Electrical points A coordinated schedule for appliances, worktop sockets and lighting, reviewed by the electrician.
Extraction Selected system, duct or recirculation arrangement, required components and access for maintenance.
Floor and wall finishes Finished levels, build-ups and the sequence around cabinetry, plinths, splashbacks and worktops.

Choose the appliance, not just its description

“Integrated fridge” or “venting hob” is not a complete specification. Ask for the model number, dimensions and fitting instructions before the housing and services are finalised. Confirm which party orders each appliance and who checks that a substitution will fit.

If availability changes, record the replacement model and have its requirements checked before accepting it. This is particularly useful when you are buying appliances separately from the kitchen. The person supplying the product and the person preparing its housing need the same information.

Resolve extraction while the route is still accessible

Extraction affects the room as well as the appliance. BORA’s explanation of exhaust and recirculation systems distinguishes air discharged outside through ducting from air filtered and returned to the room. The suitable arrangement depends on the product and the building.

Ask your designer and installer to mark the proposed route, identify the components included in the quotation and confirm access for filters or servicing. Have the relevant professional check any building or ventilation requirements. A preference for a clean ceiling or uninterrupted island drawers should be discussed alongside these practical constraints.

Walk through the room before fixing the services

Use the proposed layout to work through a normal morning: unloading the dishwasher, making coffee, preparing breakfast and moving past someone seated at the island. Open the appliance and cabinet doors on the drawing. Include the space occupied by stools when somebody is sitting on them.

In our Luxury of London project, the island photographs show seating and a recessed pop-up socket. Those visible details are useful prompts for your own plan: where will someone plug in a laptop, and will that point conflict with preparation space? The photograph does not establish the concealed services or the specification your room needs.

If the island’s role is still undecided, use our sink-or-hob island guide before signing off its service positions.

Agree who checks each handover

Put a short responsibility list beside the drawings. Identify who checks the room before delivery, who confirms the worktop templating requirements and who coordinates reconnection after the surfaces are fitted. Ask how proposed changes will be recorded and approved.

Keep an outstanding-decisions list with an owner and an agreed date for each item. Confirm any effect on the programme or quotation before authorising a change. This gives everyone a clear record without relying on a conversation remembered differently by several trades.

Bring the unresolved decisions to your designer

If you already have plans and a quotation, request a kitchen quote review. We can discuss an alternative Sheraton proposal and the scope you need to compare. For a project still taking shape, request a design consultation with your plans and intended timing. Appointment requests are confirmed by the team.

Your questions, answered

What is kitchen first fix?

It is the stage when services such as pipework and cabling are prepared before finishes conceal them. The exact work and sequence depend on the project. Ask your builder and kitchen designer to agree what must be decided and checked before that stage starts.

Do I need to choose appliances before first fix?

Choose the exact models, or have an agreed specification checked, before their housings and service positions are finalised. If a product changes, ask the designer and relevant installer to confirm that the replacement works with the planned kitchen.

Can I move the kitchen island after first fix?

A move may affect power, water, drainage, extraction or flooring. Ask the team to check the consequences and agree any revised drawings, cost and timing before changing its position.

Should my builder work from the kitchen showroom plan?

The team should agree the current coordinated drawings and the installation information required by each trade. An early showroom layout may still need a site survey, service details or final dimensional checks before it is suitable for construction.

Scroll to Top

Thank you for requesting our brochure

Your kitchen inspiration is ready. Download the Sheraton Interiors brochure below.

Download your kitchen brochure

Ready to discuss your plans? Request a free design consultation.

020 8894 5650
info@sheratoninteriors.co.uk

Request your free 2026 brochure